Earthwork
Volume & Earthwork Calculation
Precise cut-fill analysis and earthwork quantity calculation using drone and DGPS data.
What You Get
Built vs design comparison
Verify constructed elements against drawings for QA and billing.
Accurate documentation
Capture final positions, levels and dimensions for records.
Maintenance-ready data
Useful for facility management and future modifications.
Complete deliverables
As-built drawings, coordinate lists and summary report.
Workflow
1
Design review
Collect IFC/design drawings and define verification points.
0.5–1 day2
Field measurement
Measure constructed elements and capture deviations.
1–5 days3
Draft as-built set
Update drawings, mark changes and run QA/QC.
1–3 days4
Final handover
Deliver as-built package and documentation.
0.5–1 day“dfdsfsdfdsfsdfsdfsdfsdf af f asf as faf af asf asffs asfas f as fasf safasdf afs asfasfasfasfasdfafaf asdf asfasfasf asfsd”
Akil Badi
Founder-UltraGen Technologies